Major projects and tasks developed and executed by TRANSSYSTEM Ltd:

Major projects and assignments developed and completed by

“าRANSSYSTEฬ” Ltd :

 

  • Project (Design ) for Drainage of Belovo Railway Station Platform and Railway Track Line and Level Optimisation

Year 2005

 

* Project (Design ) for Railway Track Optimisation and Parameter Identification Registry in the Dguliunica - Stradgica Line Section – 2 km.

Year 2005

 

* Project (Design ) for Railway Track Optimisation and Parameter Identification Registry in the Drianovo – Careva livada Line Section – 2 km.

Year 2005

 

* Elaboration of cadastral map of “Poduene” passenger station area.

Year 2005

 

* Project (Design ) for Railway Track Optimisation and Parameter Identification Registry in the Ressen – Polikraishte Line Section

Year 2005

 

* Project (Design ) for Railway Track Optimisation and Parameter Identification Registry in the Russe – Dolapite – Ivanovo Line Section

Year 2005

 

* Project (Design ) for Drainage of Anton Railway Station Platform and Railway Track Line and Level Optimisation

Year 2005

 

* The “ Vidin – Calafat Danube Bridge ” Project : Subcontractor for the Technical Design of Railway Infrastructure on Bulgarian Territory

Year 2003 –2004

 

* Project (Design ) for a Railway Link of “SHISHEDJAM” AD Targovishte to the Existing Rail Infrastructure .

Year 2004

 

* Elaboration of Detailed Arrangement Plan for the Belovo Railway Station Adjacent Territory

Year 2004

 

* Project (Design ) for Railway Track Rehabilitation in Tunnel น 18 of Radevtsi – Krastets Line Section

Year 2004

* Port of Bourgas Expansion Project : Railway Part Design

Year 2003 - 2004

 

* Project ( Design ) for Mechanized Railway Track Renewal in the Anton – Koprivshtitsa Line Section

Year 2002 – 2003

 

* Project ( Design ) for Railway Track Rehabilitation in the Veliko Tarnovo Station – Trapezitsa Halt Line Section

Year 2002

* Geodetic Survey and Investigation of Deformations of TV Towers and Masts

Year 2002 – 2004

* Project ( Design ) for Emergency Railway Track Overhaul in the Chumerna – Oreshak Line Section

Year 2002

 

* Pre-Investment Studies for the Construction of the Second Danube Bridge “ Vidin – Calafat ” at km 796: Railway Infrastructure Part – Railway Line Route Variations ; Cross - Border Railway Stations Sites ; Technological Calculations

Year 2001

 

* Project ( Design ) for Mechanized Railway Track Renewal in the Lesichery – Ressen Line Section

Year 2001

* Project ( Design ) for Mechanized Railway Track Renewal in the Lesichery Station

Year 2001

 

* Project ( Design ) for Mechanized Railway Track Renewal in the Sliven – Jelyu Voyvoda – Zimnitsa Line Section

Year 2001

* Project ( Design ) for Mechanized Railway Track Renewal in the Jelyu Voyvoda Station

Year 2001

* Elaboration of Specialized Maps of Pernik Railway Passenger Station ; Belovo Railway Station , Sofia United Locomotive Depot ; Podouyane Locomotive Depot ; Sofia Central Railway Station; and Poduyane Railway Passenger Station

Year 2000 – 2004

 

* Project ( Design ) for Mechanized Railway Track Renewal in the Pavlikeny – Lesichery Line Section

Year 1999 – 2000

* Project ( Design ) for Thompson Railway Station Reconstruction – Mezdra Side Station Grid with Chainage of the Station and Part of the Line Section

Year 1999

 

As designers of many years experience , before establishing the “า RANSSYSTE ฬ” Ltd , the Company experts have been involved in the design activities for the following major projects:

 

* Design of a Railway Line between Republic of Bulgaria and Republic of Macedonia: 9 km Line Section Following Beliakovtsi Station (Macedonia), as well as a Line Section from Kriva Palanka Station to the Border with Bulgaria – Geodetic Surveys and Technical Design (Work Drawings)

Year 1995 – 1997

 

* Geodetic Design of the “ Deve Bair ” Cross - Border Tunnel between Republic of Bulgaria and Republic of Macedonia

Year 1995

 

* Cadastre Plan of Sofia Airport

Year 1995 – 1997

 

* Plovdiv – Svilengrad Railway Line : Concept Design – Variations for 1 60 and 200 km/h Speed

Year 1992

 

* Marshalling Yards : Development of a Software Programme Package Modeling Wagon Behaviour at Hump Release and Location of Screw-Type Wagon Retarders within the Marshaling Park

Year 1988